Call 0466 344 445
    Back to blog
    November 17, 2026

    What happens during a post-construction termite barrier installation in Sydney?

    Technician explaining post-construction termite barrier treatment at a Sydney home

    A post-construction termite barrier installation in Sydney follows a clear sequence: inspection, drilling and injection around the foundation, trenching and treating the subfloor, and sealing of drill holes. The technician creates a continuous treated zone termites cannot cross, then records the installation. Priority Pest Services shows you where we will drill before we start and gives you a fixed quote before any work begins.

    • Inspection confirms the construction type and access
    • Drilling and injection around the foundation where paths meet the slab
    • Trenching and treating the subfloor where soil is exposed
    • Drill holes are sealed and the installation is recorded

    Step 1: Inspection confirms the approach

    Installation starts with an inspection of the foundation, subfloor, surrounding paths and garden. We confirm the construction type, the access and whether any existing barrier is present. This decides whether your home suits drill-and-inject, trenching or a combination. See our post-construction termite barrier service for the full method.

    Step 2: Drilling and injection around the foundation

    Where concrete paths or patios meet the foundation, we drill small holes through the concrete and inject chemical under pressure. This creates a treated zone beneath and around the slab edge that termites cannot cross. We show you where we will drill before we start, so there are no surprises.

    Step 3: Trenching and treating the subfloor

    Where soil is exposed along the foundation, we trench along the footing and flood the subfloor with chemical to saturate the soil. This completes the continuous treated zone around the home. The method depends on how your home is built and what access is available.

    Step 4: Sealing drill holes

    Once the treatment is done, we seal the drill holes so the paths and patio are tidy and safe. You can see where the work was done without it looking obvious.

    Step 5: Recording the installation

    We record what was installed and where, and advise on a follow-up inspection schedule. Keep the documentation for your records and any future inspections. Read our guide on whether a post-construction barrier suits your home for who benefits most.

    "A complete treated zone means termites cannot get from the soil into your home without crossing the chemical. The drilling and trenching are how we make that zone continuous."

    How long does installation take?

    Most post-construction barriers are installed in a day or two, depending on the perimeter length and how much drilling and trenching is needed. We tell you the expected time on site before we start.

    Do you need to leave the house?

    You may need to keep pets and people away from treated areas until the chemical dries, usually a few hours. We tell you the re-entry time before we start. For the broader safety picture, read our guide on pest control around kids and pets.

    Do you still need inspections?

    Yes. A barrier is not fit and forget. Garden beds, paving and renovations can bridge it over time. Annual inspections catch any bridging early. Read our guide on how often to book a termite inspection to plan your schedule.

    We install post-construction termite barriers in the Hills District, post-construction termite barriers in the Northern Beaches and post-construction termite barriers in the Sutherland Shire, as well as every other part of Greater Sydney.

    Key tips for a smooth installation

    • Clear stored items and mulch from around the house walls before we arrive.
    • Give us access to the subfloor and all sides of the house.
    • Keep pets away from the work area until the chemical dries.
    • Book annual inspections to keep the barrier working.

    Read our guide on what can go wrong with a post-construction barrier to avoid common issues after installation.

    Ready to protect your existing home?

    Priority Pest Services installs post-construction termite barriers across Greater Sydney, with a clear process and a fixed quote after inspection. Call us or request a free quote online to book today.

    Call 0466 344 445 Get a free quote

    Frequently Asked Questions

    What happens during a post-construction termite barrier installation?

    We inspect the site, then drill and inject around the foundation and trench and treat the subfloor to create a continuous treated zone. Drill holes are sealed afterwards and the installation is recorded.

    Will you drill through my paths or patio?

    Where concrete paths or patios meet the foundation, we drill small holes and inject chemical under pressure to create a complete treated zone. We show you where we will drill before we start and seal the holes after.

    How long does installation take?

    Most post-construction barriers are installed in a day or two, depending on the perimeter length and how much drilling and trenching is needed.

    Do I need to leave the house during installation?

    You may need to keep pets and people away from treated areas until the chemical dries, usually a few hours. We tell you the re-entry time before we start.

    How do I know the barrier is complete?

    We record what was installed and where, and advise on a follow-up inspection schedule. Annual inspections check the barrier has not been bridged.