Book a pre-construction termite barrier as soon as your build date is known. Part of the barrier must be installed before the concrete slab is poured, so timing matters. Once the slab is down, that stage is gone. Priority Pest Services works with your builder's schedule to install a compliant barrier on time, protecting your new Sydney home from the ground up.
- Book a pre-construction barrier as soon as your build date is confirmed
- Part of the barrier goes in before the slab pour, so early booking matters
- Once the slab is poured, a physical barrier underneath can't be added
- We work with you or your builder to meet the construction schedule
Why timing matters for a pre-construction barrier
A pre-construction termite barrier is installed in stages. The first stage fits the barrier around pipe penetrations and under the slab area before the concrete is poured. The second stage completes the perimeter after the slab is set. If you book late and the pour has already happened, the first stage cannot be installed. See our pre-construction termite barrier service for the full process.
What happens if you book too late?
If the slab is already poured, a physical barrier under the slab is no longer an option. You may still be able to use a chemical soil treatment or a post-construction barrier, but these are different approaches. Booking early keeps every option open and is usually the cheaper and more effective route.
How to align the barrier with your builder
- Confirm your build date as early as possible.
- Send us the slab plans and plumbing layout so we can prepare.
- Share your builder's schedule so we book the pre-pour stage at the right time.
- Book the post-pour stage for after the slab is set.
- Keep the paperwork for your certifier and records.
Read our guide on what is included in a pre-construction barrier for what each stage covers.
Who arranges the barrier, you or your builder?
Builders often arrange the barrier as part of the build, but not always. Check your building contract to see who is responsible. We can work directly with you or with your builder to meet the schedule and provide the documentation your certifier needs.
"The slab pour is the deadline. Book the pre-pour stage before it and the rest of the barrier follows on schedule."
Is a pre-construction barrier required in NSW?
NSW building codes require termite protection on new constructions. A pre-construction barrier installed to AS 3660.1 is one compliant way to meet that requirement. Your certifier will need the installation documentation, which we provide. Compare the options in our guide on chemical vs physical termite barriers.
Do you still need inspections after a pre-construction barrier?
Yes. A barrier protects against entry, but garden beds, paving and later landscaping can bridge it. Annual inspections catch any bridging early. Read our guide on how often to book a termite inspection to plan your schedule after the build.
We install pre-construction termite barriers in the Hills District, pre-construction termite barriers in the Northern Beaches and pre-construction termite barriers in the Sutherland Shire, as well as every other part of Greater Sydney.
Key tips to book on time
- Book when the build date is confirmed, not when the slab is poured.
- Send the slab and plumbing plans so we can prepare.
- Check who arranges the barrier in your building contract.
- Keep the installation paperwork for your certifier.
Building a new home in Sydney?
Priority Pest Services installs compliant pre-construction termite barriers on your builder's schedule. Call us or request a free quote online to book the pre-pour stage in time.
Frequently Asked Questions
When should I book a pre-construction termite barrier?
As soon as your build date is known. Part of the barrier must go in before the slab is poured, so booking early ensures we can match your builder's schedule.
What happens if I book late?
If the slab is already poured, a physical barrier can't be installed underneath. A chemical soil treatment or a post-construction barrier may be the remaining options, so early booking matters.
Do I need the barrier before the slab pour?
Yes. The barrier around pipe penetrations and under the slab area is installed before the pour. A later stage completes the perimeter after the slab is set.
Can my builder arrange the barrier?
Builders often arrange the barrier as part of the build. Confirm who is responsible in your contract. We can work directly with you or your builder to meet the schedule.
Is a pre-construction barrier required by law in NSW?
NSW building codes require termite protection on new constructions. A pre-construction barrier is one compliant way to meet that requirement under AS 3660.1.