A pre-construction termite barrier in Sydney includes a physical barrier fitted around pipe penetrations and the slab area before the concrete pour, a perimeter barrier completed after the slab is set, and installation documentation for your certifier and records. It is designed to protect the building for up to 50 years. Priority Pest Services installs the barrier in line with AS 3660.1 and works to your builder's schedule.
- A physical barrier around pipe penetrations and the slab area before the pour
- A perimeter barrier completed after the slab is set
- Documentation for your certifier and your records
- Designed to protect the building for up to 50 years
What does a pre-construction barrier cover?
A pre-construction barrier blocks the main termite entry points into a new building. The installation covers:
| Area | What is protected |
|---|---|
| Pipe penetrations | Barriers around plumbing where pipes enter the slab |
| Slab area | Barrier under the slab before the pour |
| Slab edge | Exposed slab edge protection |
| Perimeter | Barrier around the outside after the slab is set |
How is the barrier installed?
Installation happens in two stages to match the construction sequence.
- Pre-pour stage: We fit the barrier around pipe penetrations and the slab area before the concrete is poured.
- Post-pour stage: We complete the perimeter barrier after the slab is set.
- Paperwork: We provide installation documentation for your builder, certifier and records.
See our pre-construction termite barrier service for the full process.
How long does installation take?
The pre-pour stage is completed in a few hours on site, timed to your builder's pour. The post-pour perimeter stage is another short visit. We schedule both so the barrier is in place without delaying your build.
What documentation do you receive?
You receive installation documentation showing what was installed and when. Your certifier needs this for compliance, and you keep a copy for your records and any future inspections. If you ever sell the home, the documentation proves the barrier was installed to standard.
"The paperwork matters as much as the barrier. Your certifier needs it for sign-off, and you need it for future inspections and resale."
How long does the barrier last?
A physical barrier is designed to protect the building for up to 50 years, as long as it is not damaged or bridged by later building or landscaping work. Compare it with a chemical barrier in our guide on chemical vs physical termite barriers.
Do you still need inspections?
Yes. A barrier blocks entry, but garden beds, paving and extensions can bridge it over time. Annual inspections catch any bridging early. Read our guide on how often to book a termite inspection to plan your schedule after the build. To keep the barrier working, read our guide on common pre-construction barrier mistakes to avoid.
We install pre-construction termite barriers in the Hills District, pre-construction termite barriers in the Northern Beaches and pre-construction termite barriers in the Sutherland Shire, as well as every other part of Greater Sydney.
Key tips to get a complete barrier
- Book the pre-pour stage before the slab is poured.
- Send the slab and plumbing plans so the barrier fits your build.
- Keep the installation paperwork for your certifier and records.
- Book annual inspections to protect the barrier over time.
Building a new home and need a barrier?
Priority Pest Services installs compliant pre-construction termite barriers in Sydney, with documentation for your certifier. Call us or request a free quote online to book today.
Frequently Asked Questions
What does a pre-construction termite barrier include?
It includes a physical barrier fitted around pipe penetrations and the slab area before the pour, a perimeter barrier after the slab is set, and documentation for your certifier and records.
How long does installation take?
The pre-pour stage is done in a few hours on site. The post-pour perimeter stage is another short visit. We schedule both around your builder's slab pour.
Do I get a certificate or report?
Yes. You receive installation documentation showing what was installed and when, which your certifier needs for compliance and you keep for your records.
Does the barrier cover the whole slab?
It covers the slab edge, pipe penetrations and the perimeter, which are the main termite entry points. The design follows AS 3660.1 for your construction type.
Will the barrier last the life of the building?
A physical barrier is designed to protect the building for up to 50 years, as long as it is not damaged or bridged by later building or landscaping work.
